Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1284LM23Q0038
This is a presolicitation notice only. The solicitation is expected to post in the next 5 to 10 business days with additional information. GAOA WILD AND SCENIC RIVER ACCESS SITE DEFERRED MAINTENANCE -...
This is a presolicitation notice only. The solicitation is expected to post in the next 5 to 10 business days with additional information. GAOA WILD AND SCENIC RIVER ACCESS SITE DEFERRED MAINTENANCE - GLACIER VIEW Flathead National Forest Glacier View Ranger District Flathead County, Montana Contract Type. This is a service for a Firm-Fixed-Price contract. Description of Work. The project consists of road clearing, reconditioning, drain dip installation, and re-establishing driving surface. This includes watering, mixing, blading, shaping, and compaction of processed material into a smooth non-segregated road surface. This work will also include the installation of drain dips, as staked, suitable for recreation traffic at specified locations within the roadway. Sections of roadway identified in the plans that require roadway reconditioning shall be fully reconditioned to include, ditch, shoulders, inlets/outlets, scarification, shaping, watering and compacting in accordance with applicable specifications. Clearing of roadside brush and vegetation, including the disposal of material generated, as needed for project operations, will be allowed and shall be incidental to payment for the work being performed. Project Location. To reach the project start point from Flathead National Forest Supervisors Office, drive 16.7 miles to Columbia Falls, Montana via U. S. Highway No. 2 E, then turn left on 4th Ave. W in Columbia Falls. Continue onto 1st Ave. W N / Railroad Street. Drive 1 mile and continue onto North Fork Road. The project starting point is located on the Glacier View Ranger District, Section 35, Township 32 North, Range 20 West, PMM. Directions - Continue on North Fork Road for: 10.1 miles and turn right on NFSR 10363 for Glacier Rim River Access Site. 15.8 miles and turn right on NFSR 1070 for the Great Northern Flats River Access Site. 44.6 miles and turn right on NFSR 308 for the Ford River Access Site. Period of Performance. The estimated start date is May 15, 2023 through October 30, 2023. The contract time will run continuously from the effective notice to proceed. Contact Information: Contact the Contracting Officer (CO), Darrin Jackson by email via darrin.jackson@usda.gov if you have any questions. No site visit is planned at this time.