Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:12837120Q0206
Contractor shall furnish all materials, equipment, transportation, labor, supervision, and other associated work necessary to complete work according to the specifications. The internal and external c...
Contractor shall furnish all materials, equipment, transportation, labor, supervision, and other associated work necessary to complete work according to the specifications. The internal and external coatings of the existing potable water tank at the Nogales Ranger District Office is failing, leading to rusting/corrosion of the tank and reduced service life. The Contractor shall repaint/recoat the existing tank to re-establish both coatings. SITE VISIT: THURSDAY,SEPTEMBER 10, 2020 10:00 AM In accordance with the Miller Act Payment Bonds (100%) are required. In accordance with FAR 36.204(f), the construction magnitude of this project is estimated between $25,000.00 to $50,000.00. NAICS: 236220 SIZE STANDARD: $39.5M TOTAL SMALL BUSINESS SET ASIDE