Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:12837120Q0197
The Contractor shall furnish all labor, supervision, equipment, submittals, traffic control and materials necessary for fabrication and installation of trail gates as shown on the drawings. Installati...
The Contractor shall furnish all labor, supervision, equipment, submittals, traffic control and materials necessary for fabrication and installation of trail gates as shown on the drawings. Installation of fence, clips, stays, other materials and fence post as shown on drawings. Sign installation on equestrian gates. Access to some locations shall need to be hiked to, use of ATV’s or use of 4x4 high clearance vehicles, two trail sites shall have existing railroad ties that are partially buried into the ground removed from the site, at the locations indicated on the attached map(s). No staging areas will be allowed.