Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1282B125Q0008
NEW INFORMAITON PERTAINING TO THE STATEMENT OF WORK HAS BEEN INCLUDED IN THE DOCUMENTS SECTION AND THE SOLICITATION PERIOD HAS BEEN EXTENDED UNTIL 01/13/2024. Work for this project includes supplying ...
NEW INFORMAITON PERTAINING TO THE STATEMENT OF WORK HAS BEEN INCLUDED IN THE DOCUMENTS SECTION AND THE SOLICITATION PERIOD HAS BEEN EXTENDED UNTIL 01/13/2024. Work for this project includes supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary licenses and permits for the following: 1. Removing existing lift station pumps, plumbing and miscellaneous equipment not required for lift station operation and as directed by the CO. 2. Providing and installing duplex grinder pumps and rail lift system. 3. Work also includes connection of the pump discharge piping to the existing lift station outlet, including a new check valve and ball valve on each pump outlet. 4. Miscellaneous work includes but is not limited to: pumping out the lift station basin, disconnect/connect electrical supply, and mounting equipment to the basin as required by the manufacturer. 5. All cleanup work is included and considered incidental to the other work items.