Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1282B124T0001
The scope of this project is to reconstruct two sections totaling approximately 560 feet of 72” wide, full bench stock trail and 9,000 of 36” wide trail restoration to access the site. Reconstruction ...
The scope of this project is to reconstruct two sections totaling approximately 560 feet of 72” wide, full bench stock trail and 9,000 of 36” wide trail restoration to access the site. Reconstruction is within extremely steep slopes, loose soils, extensive rock, eroding rock cliffs, outcroppings, and bedrock. This work is related to the flood event of June 2022. The project is located in wilderness. Work included repeated, extensive surface and subsurface blasting to establish a 72” full bench trail and remove excess material from the backslope and hillside above the trail. Use of jack hammers, rock bars and picks will be necessary as well.