Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1282B123R0035
This requirement is for the brushing of roads on the Payette NF in 2023 and 2024. This brushing will occur on all road segments listed in the schedule of items. Upon completion of the road brushing th...
This requirement is for the brushing of roads on the Payette NF in 2023 and 2024. This brushing will occur on all road segments listed in the schedule of items. Upon completion of the road brushing the roads will have had all vegetative material under 6” dia. removed from within 5’ of the outside edge of the shoulder or ditch if it exists on the cutslope. All material under 6” dia. From within 3’ of the outside edge of the shoulder on the fill slope. Material will be removed up to a height of 14’ above the road surface. Clearing on the inside edge of major curves will be extended out to 8’. Cuts shall be as smooth and as close to the tree bole as practical. Care will be taken not to scar trees that remain. All cut material will be removed from the drainage features and roadway. This requirement will have a base plus (2) two options. Option two (2) will be cost per mile.