Inactive
Notice ID:12805B23R0029
Contractor will need to provide all labor, equipment, supplies, material, and coordination to remove three (3) existing walk-in chambers and replace them with three (3) new walk-in chambers. Existing ...
Contractor will need to provide all labor, equipment, supplies, material, and coordination to remove three (3) existing walk-in chambers and replace them with three (3) new walk-in chambers. Existing chambers will be disassembled and appropriately recycled or disposed of by the contractor. Each chamber will be approximately 7 feet wide by 11.5 feet deep by 8 feet high. Chambers must have industrial grade control systems, plant centric, or familiarity with plant growth facility operations. Utility requirements will include electrical service, floor drain outside the footprint of the cabinet, and a humidty system. Electrical inspection by an inspection authroity accredited by OSHA will be required. Upon installation, the contractor will need to provide a start-up report and warranty for the new chambers.