NFSR 141 Paving Project
The Gila National Forest requires rehabilitation and maintenance of National Forest System Road 141 from milepost 0.69 to 18.81, including pulverizing the existing chip seal, reshaping the road template, and installing new culverts and signs. The base contract covers work from milepost 0.69 to 9.47, adding a 3-inch asphalt layer over a 4-inch aggregate base, with optional items for the remaining 9.34 miles if funding allows. The contractor must provide all labor, materials, equipment, and supplies. This acquisition is a total small business set-aside under NAICS 237310 with a $45M size standard. Performance is located on the Gila National Forest, with a site visit on May 18, 2026, and proposals due by June 5, 2026.