Midgley Bridge Observation Site Parking Lot
127EAX26Q0068
The work involves removing existing pavement, replacing it, and adding drainage inlets and corrugated steel pipes at the Midgely Bridge Observation Site parking lot. A concrete curb and gutter will collect and divert storm water to the inlets. The site will also be restriped, and new signs, traffic delineators, and concrete wheel stops will be installed. An organized site visit is scheduled for August 18th, 2026 at 10:00 am local time.