TBRD Water Leak Repair Phase 2
The Tonto National Forest requires a contractor to eliminate known water leaks, improve network efficiency, and handle future leak repairs over a one-year period under optional line items. The contractor must provide labor, materials, and equipment, and deliver as-built drawings upon project completion. An organized site visit is scheduled for May 26, 2026, at 10:00 AM local time, meeting at 28079 AZ-188, Roosevelt, AZ 85545. This acquisition is a total small business set-aside under NAICS code 238220 with a $19M size standard. No budget amount is specified.