Nail Canyon Wash Restoration (Snake Gulch)
Amendment 0001 -- Adds the correct SOI and extends to Proposal Due date till September 10th, 2025 by 1:00 PM CD. Installation of two rolling dips and five locations of bank stabilization and armoring ...
Amendment 0001 -- Adds the correct SOI and extends to Proposal Due date till September 10th, 2025 by 1:00 PM CD. Installation of two rolling dips and five locations of bank stabilization and armoring ...
This project includes the installation of two rolling dips and five locations of bank stabilization and armoring using geotextile and riprap on NFSR 423 and 642. Optional items include road reconditio...