Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:127EAX24Q0028
Awarded-- Rusty Bucket Construction See attached Award notification for the particulars 7/15/2024 Amended Solicitation submittal date:and added questions and answers Submittal date extended from 7/12/...
Awarded-- Rusty Bucket Construction See attached Award notification for the particulars 7/15/2024 Amended Solicitation submittal date:and added questions and answers Submittal date extended from 7/12/2024 to 7/29/2024 at 12:00 pm 7/15/20246/28/2023--Added specifications_summary of work attachment The Contractor shall be responsible for furnishing all labor, equipment, transportation, and specified materials/supplies necessary to complete the replacment of two (2) underground water system control valves, one (1) 4” backflow preventer assembly, two (2) electric heaters, two (2) roof penetration boots, one (1) propane shut-off valve, one (1) electric incinerating toilet, and one (1) ¾” PEX water line (approximatly 3” in length). The contractor is also responsible for furnishing all labor, equipment, transportation, and specified materials/supplies necessary to complete the following new improvements. One (1) French Drain (21’L x 2’W x 2.5’D) and associated underground 4” drainage culvert (approximatly 65 L.F.), one (1) 120v, 15 amp circuit with quadplex outlet installed on existing steel lookout tower (intended outlet location is approximatly 100’ above ground level) The Contractor shall be responsible for furnishing all labor, equipment, transportation, and specified materials/supplies necessary to complete the repair/replacement of the existing 4” sanitary sewer at Big Springs Work Center (Bid Items #9 and #9A). The intent of this contract is to either clear the blocked sewer line using non-destrictive methods or to completely replace the blocked section of sewer (damaged sections of sewer line shall not be left in-place without adaquate repair to fully restore integrity of sewer pipe). Contractor will be responsible for investigating the nature of the blockage, and determining the appropriate course of action to bring the blocked sewer into full working order. If the sewer pipe is found to be physically compromised, then replacment of the compromised section will be requiered. Only one of the two bid items, #9 and #9A will be paid. Contractor is responsible for coordinating with COR during the process to elect which bid item will be necessary for successful repair of the sanitary sewer