Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:127EAW24R0033
127EAW24R0033 - Kelly Gulch Culvert - A00002 The purpose of this amendment is post revised Statement of Work and project drawings Attached is "1. Statement of Work - REVISION 001" and "3. Project Draw...
127EAW24R0033 - Kelly Gulch Culvert - A00002 The purpose of this amendment is post revised Statement of Work and project drawings Attached is "1. Statement of Work - REVISION 001" and "3. Project Drawings - REVISION 001" which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive. ////////////////////////////////////////////////////////////////////////////////////////////////////////// 127EAW24R0033 - Kelly Gulch Culvert - A00001 This amendment is to inform the public of a Forest Service led site visit. See page 2 for full details. PLEASE RSVP TO THE SITE VISIT BY EMAILING: GREGORY.CUNNINGHAM@USDA.GOV An organized site visit has been scheduled for- Date / Time: May 23rd, 2024, at 9:00 AM PST Participants will meet at- Address / bldg. #: 11263 N State Highway 3, Fort Jones, CA 96032 FS personnel leading Site Visit Contact Info Title: Civil Engineer Name: Samuel Marano Phone #: : (484) 238-3891 ////////////////////////////////////////////////////////////////////////////////////////////////////////// 127EAW24R0033 - Kelly Gulch Culvert Klamath National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $100,000 and $250,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, May 29th, 2024. A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award.