Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:127EAT21Q0045
UPS replacement and installation The contractor shall provide all personnel, equipment, supplies, tools, material and management to perform work to replace the existing Power Plus 50, Model 40 40 kVA ...
UPS replacement and installation The contractor shall provide all personnel, equipment, supplies, tools, material and management to perform work to replace the existing Power Plus 50, Model 40 40 kVA (Serial Number EQ4993ZBA02) with one (1) 15kVA/15kW Capacity, 3 phase UPS or equivalent. The new UPS shall include a minimum run time of 8 minutes or greater at full load. The Contractor shall ensure compliance with all ASME Safety Code requirements, the manufacturer’s recommendations, and all other applicable laws, regulations, rules, ordinances, and codes