Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:126612-20-Q-0017
General Demolition Requirements are as follows for Boiler. Disconnect electrical service from panel. In accordance with industry standards Disconnect the fuel oil lines and equipment, in accordance wi...
General Demolition Requirements are as follows for Boiler. Disconnect electrical service from panel. In accordance with industry standards Disconnect the fuel oil lines and equipment, in accordance with industry standards. Remove stack, and all boiler related parts and components, in accordance with industry standards. Repair / patch of roof from the stack in accordance with industry standards. Dispose of all material properly in an appropriate landfill or equivalent site