Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1263PX20R0009
08/27/2020: The contract is being awarded to Best Choice Construction LLC in the amount $34,500.00. 08/12/2020 Update: The amount of pilaster removed from the concrete wall is measured from the roof d...
08/27/2020: The contract is being awarded to Best Choice Construction LLC in the amount $34,500.00. 08/12/2020 Update: The amount of pilaster removed from the concrete wall is measured from the roof deck to that point required to allow the construction of the new reglet and counter flashing. Termination with reglet counterflashing shall be in accordance with roofing system manufacturer’s standard detail. Removal of pilaster above the counterflashing is not required. Work for this project requires the Contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery, and all necessary valid licenses for the work summarized as follows: 1. Remove and/or set aside as necessary rooftop equipment. 2. Full tear-off of existing roofing system: single-ply EPDM, ballast, insulation, sheet metal trim. 3. Install additional wood blocking as necessary to accommodate additional roofing insulation and to support sheet metal flashing and trim. 4. Install new roofing insulation. (Roof deck is adequately sloped for drainage.) 5. Install new fully adhered Single-Ply roofing system. 6. Replace sheet metal trim with drip edge and no water dam. Eliminate scuppers. 7. Provide counterflashing at wall terminations. Cut reglet at concrete wall; remove pilasters. 8. Incorporate curbs and penetrations into the new roofing system. Follow roofing system manufacturer’s flashing recommendations. 9. Re-install rooftop equipment. Site Location: FSL Rhinelander 5985 Hwy K Rhinelander, WI 54501