Building 63 Envelope and HVAC Renovation, Coral Gables
The work is at the USDA Subtropical Horticulture Research ARS Station, covering roughly 6,000 square feet of lab and office space. The existing HVAC system—including an air-cooled chiller, pumps, and two VAV air handling units—has ductwork condensation causing water damage, and lab humidity has been measured at 70% or higher. An A&E firm completed retro-commissioning and TAB services and provided designs for renovations to the roof, HVAC, building automation system, and chiller. Solicitation documents and amendments are posted, with final stamped construction drawings and specifications to be posted after internal reviews are complete. No budget amount or performance timeline is specified beyond the posted procurement actions.