Fire suppression system installation
The USDA is seeking a turnkey retrofit of a wet fire suppression system for Building 6418 at Moore Air Base, Texas, following a recent fire in a building originally constructed in the early 1980s without suppression. The contractor must provide design/as-built drawings and install everything needed for a fully functioning system. The new sprinkler system must be capable of connecting to a future fire panel, but no monitoring is required; existing fire panels are obsolete and will be replaced separately. USDA prefers Schedule 40 Victaulic black iron piping. The solicitation has been postponed indefinitely.