Kennel Building Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:12639526Q0088

The USDA-APHIS-Wildlife Services requires construction of a new pre-engineered metal kennel building (approximately 3,400 SF) at the Predator Research Facility, which focuses on carnivore management to reduce conflicts with livestock and humans. The building will include kennel areas A & B, a mud room, and a mechanical room, based on final design documents by Cushing Terrell. Performance location is at the Predator Research Facility, though a specific address is not provided. No budget amount is specified in the description. Timelines are not mentioned beyond bid-related deadlines, which are excluded per instructions.

Kennel Building Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:12639526Q0088

The USDA-APHIS-Wildlife Services requires construction of a new pre-engineered metal kennel building (approximately 3,400 SF) with four sections, based on final design documents. The facility supports research on carnivore management to reduce conflicts with livestock, humans, and native prey. No specific submission timelines or budget amounts are mentioned in the description. The location for performance of services is not specified. This opportunity may interest bidders experienced in metal building construction and government contracts.

Kennel Building Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:12639526Q0088

The USDA-APHIS-Wildlife Services requires construction of a new pre-engineered metal kennel building (approximately 3,400 SF) with four sections, based on final design documents. The project supports the Predator Research Facility’s mission to reduce carnivore conflicts with livestock and humans. Performance location is at the Predator Research Facility, though no specific address is provided. No budget amount is specified. No non-bid or submission timelines are mentioned.

Kennel Building Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:12639526Q0088

The USDA-APHIS-Wildlife Services requires construction of a new pre-engineered metal kennel building (approximately 3,400 SF) at the Predator Research Facility, which focuses on carnivore management to reduce conflicts with livestock and humans. The building will include kennel areas A & B, a mud room, and a mechanical room, based on final design documents by Cushing Terrell. Performance location is at the Predator Research Facility, though a specific address is not provided. No budget amount or submission timeline is specified in the description. The opportunity includes technical clarifications, such as confirming the roof panel type as PBU and roof/soffit gauge as 24 gauge.

Kennel Building Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:12639526Q0088

The USDA-APHIS-Wildlife Services requires the construction of a new, approximately 3,400-square-foot pre-engineered metal kennel building at the Predator Research Facility. The building will contain four sections: two kennel areas, a mud room, and a mechanical room. The project must be constructed per final design documents, with clarifications that the metal roof panel is to be PBU type and both roof and soffit panels are to be 24 gauge. All queries must be sent to the named Point of Contact.

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF ANIMAL AND PLANT HEALTH INSPECTION SERVICE MRPBS MINNEAPOLIS MN
  PSC   (blank) CONSTRUCTION OF MISCELLANEOUS BUILDINGS


Data sourced from SAM.gov. View Official Posting »

Kennel Building Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:12639526Q0088

The USDA-APHIS-Wildlife Services requires the construction of a new, approximately 3,400SF pre-engineered metal kennel building at the Predator Research Facility, based on final design documents. The building will contain four sections: kennel areas A & B, a mud room, and a mechanical room. The project's mission is to support ecological research on carnivore management to reduce conflicts. A geotech report and an amendment are included with the solicitation and construction documents. All queries must be sent to the named Point of Contact.

Kennel Building Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:12639526Q0088

The USDA-APHIS-Wildlife Services requires the construction of a new, approximately 3,400-square-foot pre-engineered metal kennel building at its Predator Research Facility. The building will contain four sections: two kennel areas, a mud room, and a mechanical room, and must be built according to final design documents. The facility's mission is to generate ecological information for carnivore management to reduce conflicts. The performance location is the Predator Research Facility. All queries must be sent to the named Point of Contact.

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF ANIMAL AND PLANT HEALTH INSPECTION SERVICE MRPBS MINNEAPOLIS MN
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS


Data sourced from SAM.gov. View Official Posting »

Kennel Building Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:12639526Q0088

The USDA-APHIS-Wildlife Services requires the construction of a new, approximately 3,400SF pre-engineered metal kennel building at the Predator Research Facility. The building will contain four sections: two kennel areas, a mud room, and a mechanical room, and must be built per final design documents. The facility's mission is to generate ecological information for carnivore management to reduce conflicts. All queries must be sent to the named Point of Contact.

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF ANIMAL AND PLANT HEALTH INSPECTION SERVICE MRPBS MINNEAPOLIS MN
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS


Data sourced from SAM.gov. View Official Posting »

Kennel Building Construction

Total Small Business Set-Aside (FAR 19.5)
Notice ID:12639526Q0088

The USDA-APHIS-Wildlife Services requires the construction of a new, approximately 3,400-square-foot pre-engineered metal kennel building. The facility will contain four sections: two kennel areas, a mud room, and a mechanical room, based on final design documents. The project supports the Predator Research Facility's mission of generating ecological information for carnivore management.

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF ANIMAL AND PLANT HEALTH INSPECTION SERVICE MRPBS MINNEAPOLIS MN
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS


Data sourced from SAM.gov. View Official Posting »