Steam boiler installation, Joint Base Cape Cod
12639526Q0017
This project requires the acquisition and installation of a steam boiler to replace an existing unit for environmental climate control and an autoclave system in Building 1398. The work will be performed at a facility conducting biological control research on invasive pests. The contractor is responsible for providing all labor, materials, equipment, and supervision for the installation. A site visit is scheduled, with specific entry requirements for attendees.