Lefferts Pond Accessibility Improvements

Total Small Business Set-Aside (FAR 19.5)
Notice ID:12445526Q0066

This opportunity involves the installation of an accessible dock and kayak launch on the Chittenden Reservoir, including removal of an existing concrete mat, trail construction, and installation of bollards, a headwall, and a floating dock/gangway. The contract is a total small business set-aside, with a size standard of $45,000,000. Performance location is the Chittenden Reservoir. No specific budget amount or non-bid timelines are mentioned in the description.