Hiawatha National Forest GAOA Carp River Bridge Replacement

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:12445523R0023

05/25/2023 FULL SOLICITATION PACKAGE POSTED The proposed project consists of removing the deteriorated concrete bridge and abutments and furnish and installing a new 54’ long by 18’ wide timber bridge...

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF FOREST SERVICE USDA-FS, CSA EAST 13
  PSC   REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
LOCATION:

Links ()

Attachments ()


Data sourced from SAM.gov. View Official Posting »

Hiawatha National Forest GAOA Carp River Bridge Replacement

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:12445523R0023

The proposed project consists of removing the deteriorated concrete bridge and abutments and furnish and installing a new 54’ long by 18’ wide timber bridge and abutments per the plans and specificati...

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF FOREST SERVICE USDA-FS, CSA EAST 13
  PSC   REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
LOCATION:

Links ()

Attachments ()


Data sourced from SAM.gov. View Official Posting »