Install and Repair Monitoring Systems at Dams
The contractor is responsible for providing all equipment, labor, and materials to install new PMU-9101-T-WR monitoring units at multiple listed sites. Each unit must be mounted on a 2-inch steel pole, with a minimum height of 10 feet above ground on dam embankments, and properly grounded. Cabling must be placed underground from the pole to the shoreline, and proposed system locations require approval from the Contracting Officer's Representative. No specific timelines, budget amounts, or performance location details are mentioned in the description. This opportunity involves comprehensive installation and warranty support for environmental monitoring systems.