Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:12445123Q0032
NOTICE: THIS SOLICITATION IS RESERVED FOR THE 12445522A0001-0040: Forest Service, Northeast Zone Facilities Construction and Maintenance BPA Contractor to provide all labor, tools, and equipment to: R...
NOTICE: THIS SOLICITATION IS RESERVED FOR THE 12445522A0001-0040: Forest Service, Northeast Zone Facilities Construction and Maintenance BPA Contractor to provide all labor, tools, and equipment to: Removal and disposal of a the existing 57” deep x 67” wide x 146” long concrete tank (shown above). • Installation of a new 1800 or 1850 Gallon concrete cistern in the same location as the existing one. • Installation of a 1” water line right of the tank (pictured above) to a frost-free hydrant approximately 210 feet. Includes one shutoff valve 3 feet from the cistern wall. • Installation of a second 1” water line off the left of the tank that will tee off to two frost free hydrants approximately 410 feet total (See Site Map). Includes one shutoff valve 3 feet from the cistern wall. • The water lines will be buried a minimum of 30 inches deep. • There are 9 existing water hydrants/faucets and appurtenances that will be removed and are shown on the site plan. WATER IS NOT POTABLE