Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:12444523Q0083
The Contractor shall plan/prepare for the sampling events and arrange for required laboratory analysis. All field equipment and supplies necessary for sampling and transport of samples to the lab are ...
The Contractor shall plan/prepare for the sampling events and arrange for required laboratory analysis. All field equipment and supplies necessary for sampling and transport of samples to the lab are the responsibility of the Contractor. The Contractor shall not initiate any other tasks not specifically identified in this SOW. Prior to each round of sampling, the contractor shall give the Forest Service a minimum of two weeks notice prior to starting sampling work. Contractor shall mobilize to the Robins Pond Site and Duncan Landfill Site. Procurement will be 100% set-aside for Small Business and will be conducted in accordance with FAR Part 12, 13, and 19.