LBJ Work Center Water System Monitoring for Caddo-LBJ National Grasslands of Texas
12444026Q0224
The contractor will furnish labor, incidental materials, chemicals, and transportation for sampling, testing, operation, and maintenance of the potable water supply at the LBJ Work Center. Water sampling and testing must comply with the EPA’s National Primary Drinking Water Regulations (40 CFR 141). The work requires a Class D or higher TCEQ Water Supply Division certified water system operator. Detailed requirements are provided in the attached Statement of Work.