Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT2R0018
ALL QUESTIONS DUE BY 1/19/2022 @ 1:00P.M. MT ALL PROPOSALS AND ANY AMENDMENTS (SF-30_ DUE 1/26/2021 @ 1:00P.M. SUBMIT ALL QUESTIONS AND PROPOSALS/AMENDMENTS TO LONNIE.ROOT@USDA.GOV THIS WAS PREVIOUSLY...
ALL QUESTIONS DUE BY 1/19/2022 @ 1:00P.M. MT ALL PROPOSALS AND ANY AMENDMENTS (SF-30_ DUE 1/26/2021 @ 1:00P.M. SUBMIT ALL QUESTIONS AND PROPOSALS/AMENDMENTS TO LONNIE.ROOT@USDA.GOV THIS WAS PREVIOUSLY ISSUED 12/20/2021 This work consists of the fabrication, delivery, off-loading, and installation of 4 double unit precast concrete toilet buildings with vaults, as well as demolition and disposal of 4 existing toilet buildings. The OPTIONAL bid item may or may not be awarded, but this consists of the fabrication, delivery, off-loading, and installation of 1 double unit precast concrete toilet building with vaults, as well as demolition and disposal of 1 existing toilet building. Toilet buildings must be fully accessible and must meet the design standard for naturally ventilated, odor free buildings.This work consists of the fabrication, delivery, off-loading, and installation of 4 double unit precast concrete toilet buildings with vaults, as well as demolition and disposal of 4 existing toilet buildings. The OPTIONAL bid item may or may not be awarded, but this consists of the fabrication, delivery, off-loading, and installation of 1 double unit precast concrete toilet building with vaults, as well as demolition and disposal of 1 existing toilet building. Toilet buildings must be fully accessible and must meet the design standard for naturally ventilated, odor free buildings.