GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, Colorado
An amendment has been posted for this project, including RFI questions and answers and a pre-bid site visit sign-in sheet, and offerors must acknowledge the amendment in their proposal. The work will take place at Pikes National Forest and involves installing a new 2-inch HDPE waterline beneath Colorado Highway 24, including all Subsurface Utility Engineering required for CDOT permitting. The project also includes connecting a new waterline to the existing system, replacing a well pump, installing a booster pump and storage, and performing associated electrical upgrades. It further covers replacing septic systems for multiple buildings and installing new sewer and dosing infrastructure. Asphalt removal, plus new road and gate installation, are also part of the scope.