GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT26Q0106

The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act program, will restore the natural environment at Fishlake National Forest while updating facilities for increasing recreational use and modern vehicles. Work includes demolition, new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining walls, fencing and gates, new signage, and site restoration such as grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character. Recent amendments posted to SAM.gov provide RFI questions and answers, a site visit sign-in sheet, updated specifications and SOI, and remove the government-furnished utility table requirement and composite wood fence product specifications. Amendments must be acknowledged and submitted with proposals.

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF FOREST SERVICE USDA FOREST SERVICE
  PSC   Z2LB REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS


Data sourced from SAM.gov. View Official Posting »

GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT26Q0106

The Kent’s Lake Campground Reconstruction Project in Fishlake National Forest, part of the Great American Outdoors Act, will restore the natural environment while modernizing facilities for increasing recreational use and modern vehicle requirements. The scope includes demolition, new concrete features, upgraded family and tent campsites, water and sewer infrastructure, roadway and drainage improvements, rock and retaining walls, fencing and gates, new signage, and site restoration with grading, surfacing, and seeding. Amendment 0001 was posted on August 19, 2026, and Amendment 0002 on September 3, 2026, providing updated Q&A, specifications, and SOI; both must be acknowledged and submitted with the proposal. A future amendment will post the questions and answers received. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.

GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT26Q0106

The Kent’s Lake Campground Reconstruction Project at Fishlake National Forest will restore the campground’s natural environment while updating facilities for increased recreational use and modern vehicles. Work includes demolition, new concrete features, upgraded family and tent campsites, improved water/sewer infrastructure, roadway and drainage enhancements, rock and retaining walls, fencing, gates, signage, and site restoration. The project aims to improve visitor safety, accessibility, and resource protection while preserving the forest’s natural character. Amendments to the solicitation were posted on August 19 and September 3, 2026, providing updated Q&A, specifications, and statement of objectives that require acknowledgment with proposals.

GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT26Q0106

The project involves reconstruction of Kent’s Lake Campground on the Fishlake National Forest under the Great American Outdoors Act. Work includes demolition, new concrete features, upgraded campsites, water and sewer improvements, roadway and drainage work, retaining walls, fencing, signage, and site restoration. The effort aims to improve visitor safety, accessibility, and resource protection while preserving the natural character of the forest. An amendment posted on August 19, 2026 provides an updated statement of work that offerors must acknowledge in their proposals. Performance would take place at the campground location in the Fishlake National Forest.

GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT26Q0106

The Kent’s Lake Campground Reconstruction Project is a Great American Outdoors Act initiative to restore the natural environment while modernizing facilities for increased recreational use and modern vehicles. Work includes demolishing existing structures, installing concrete features, upgrading campsites, improving water and sewer infrastructure, enhancing roadways and drainage, building rock and retaining walls, adding fencing, gates, and signage, and performing site restoration. The project also aims to improve visitor safety, accessibility, and resource protection while preserving the forest’s natural character. Performance is located at Kent’s Lake Campground. No budget or timeline information is provided in the description.