Shadow Mountain Building 97 Heat Cable and Snow Retention, Grand Lake, CO
The contractor must provide all labor, materials, and equipment to install heat tape and cabling systems on the roof, gutters, and downspouts of Building 97, including reconditioning the electrical system and installing new snow retention guards. Performance of services is located at Grand Lake, Colorado. The project magnitude is between $25,000 and $100,000. A site visit is scheduled for May 12th, 2026, at 1100 AM MDT.