WHITETAIL ROAD 224 CONSTRUCTION
This project involves constructing a roadway embankment with turnouts and ditches, installing geogrid and aggregate base, and performing seeding and erosion control on a 1.7-mile section of Whitetail Road #224. The work includes a base item and an optional item for additional aggregate placement, with the roadway to be built to a 14-foot width. A mandatory site visit is required, and all questions and quotes must be submitted via email to the specified contacts. The performance location is Whitetail Road #224. No specific budget or overall project completion timeline is provided in this description.