WHITETAIL ROAD 224 CONSTRUCTION

Notice ID:1240LT26Q0048

This project involves constructing a roadway embankment, installing geogrid, placing aggregate base, and performing seeding and erosion control on 1.7 miles of Whitetail Road #224. The work includes an optional item for additional aggregate placement, with the roadway built to a 14-foot wide surface. Performance of services is on Whitetail Road #224. No budget amount is specified.

WHITETAIL ROAD 224 CONSTRUCTION

Notice ID:1240LT26Q0048

This project involves constructing a 1.7-mile roadway embankment on Whitetail Road #224, including turnouts, geogrid installation, aggregate base course, and erosion control. Work will be performed at the designated location on Whitetail Road #224. The budget is not specified. The site visit occurred on April 28, 2026, and questions are due by May 6, 2026. Quotes are due by June 3, 2026.

WHITETAIL ROAD 224 CONSTRUCTION

Notice ID:1240LT26Q0048

This project involves constructing a roadway embankment with turnouts and ditches, installing geogrid and aggregate base, and performing seeding and erosion control on a 1.7-mile section of Whitetail Road #224. The work includes a base item and an optional item for additional aggregate placement, with the roadway to be built to a 14-foot width. A mandatory site visit is required, and all questions and quotes must be submitted via email to the specified contacts. The performance location is Whitetail Road #224. No specific budget or overall project completion timeline is provided in this description.