GAOA 4FO SMCG Trail Renovation
1240LT26Q0027
This project involves constructing an asphalt trail connecting an upper visitor center to a lower trail, including earthwork, culvert replacement, and the creation of resting pads. The scope includes clearing, excavation, grading, and the conservation and reuse of existing on-site materials. Specific technical requirements are provided for trail dimensions, slopes, aggregate base, asphalt, concrete curb, and pipe installation. The performance location is not specified. No budget information or non-bid/procurement timelines are mentioned.