GAOA 4FO SMCG Trail Renovation

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT26Q0027

This project involves constructing an asphalt trail connecting an upper visitor center to a lower trail, including earthwork, culvert replacement, and the creation of resting pads. The scope includes clearing, excavation, grading, and the conservation and reuse of existing on-site materials. Specific technical requirements are provided for trail dimensions, slopes, aggregate base, asphalt, concrete curb, and pipe installation. The performance location is not specified. No budget information or non-bid/procurement timelines are mentioned.

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF FOREST SERVICE HUMBOLDT-TOIYABE NATIONAL FOREST
  PSC   CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS


Data sourced from SAM.gov. View Official Posting »