Critical Housing Maintenance Construction at Lowman Ranger District, Boise National Forest, Idaho (GAOA)

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT26Q0011

This is a firm-fixed-price contract for the remodeling of six buildings in the Lowman Ranger District of the Boise National Forest, Idaho. The estimated construction cost is between $250,000 and $500,000. The proposed start date is April 1, 2026, with a required completion date of April 15, 2027, though work on certain buildings is restricted from mid-April through October 2026. It is a 100% Small Business Set-Aside procurement requiring payment and performance bonds. Quotes and technical proposals must be submitted via email, and several amendments have been posted, including one that requires a specific SF30 form to be acknowledged and submitted with the quote.

Critical Housing Maintenance Construction at Lowman Ranger District, Boise National Forest, Idaho (GAOA)

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT26Q0011

This is a firm-fixed-price contract for the remodeling of six buildings in the Lowman Ranger District of the Boise National Forest, Idaho. The project has an estimated construction cost between $250,000 and $500,000. The proposed start date is April 1, 2026, with a required completion date of April 15, 2027, and work on certain buildings is restricted from mid-April through October 2026. It is a 100% Small Business Set-Aside procurement requiring payment and performance bonds. Quotes and technical proposals must be submitted via email, and a site visit is scheduled for February 24, 2026.

Critical Housing Maintenance Construction at Lowman Ranger District, Boise National Forest, Idaho (GAOA)

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT26Q0011

This is a firm-fixed-price procurement for the remodeling of six buildings in the Lowman Ranger District of the Boise National Forest, Idaho, set aside for small businesses. The estimated budget for construction is between $250,000 and $500,000. The performance period has a proposed start date of April 1, 2026, with a required completion date of April 15, 2027, and includes a restriction on work for certain buildings from April 15 to October 31, 2026. A site visit is scheduled for February 24, 2026, at the Idaho City Work Center. Quotes require both a price proposal and a technical proposal addressing specific evaluation factors.

Critical Housing Maintenance Construction at Lowman Ranger District, Boise National Forest, Idaho (GAOA)

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT26Q0011

This is a firm-fixed-price contract for remodeling six buildings in the Lowman Ranger District of the Boise National Forest, Idaho. The estimated construction cost is between $250,000 and $500,000. A site visit is scheduled for 24 February 2026 at the Idaho City Work Center. The proposed project start date is 01 April 2026, with a required completion date of 15 April 2027, and work restrictions apply to certain buildings from mid-April through October 2026. This procurement is a 100% Small Business Set-Aside, and quotes must include both a price proposal and a technical proposal addressing specific evaluation factors.