Pine Valley Dam Flood Damage Repairs Sole Source Justification
The government requires construction work to repair post-fire flood damage from October 2025 at the Pine Valley Reservoir and Dam on the Dixie National Forest in Utah. The scope includes excavation, slope grading, spillway repairs, masonry reconstruction, and riprap installation to restore dam safety. The work is being awarded without full competition because it is physically and operationally integrated with an existing active contract for dam reconstruction. The incumbent contractor, Jackson Excavation Inc., is uniquely qualified as they are already mobilized on-site and performing interdependent tasks that cannot be separated without safety risks and schedule impacts. No specific budget amount or submission timeline is mentioned in the description.