The Bridger-Teton National Forest (BTNF) Dutch Joe Bridge Replacement project will remove and replace the existing Dutch Joe Bridge (370850-2.011). The existing bridge is 44-foot timber structure and ...
The Bridger-Teton National Forest (BTNF) Dutch Joe Bridge Replacement project will remove and replace the existing Dutch Joe Bridge (370850-2.011). The existing bridge is 44-foot timber structure and will be replaced with an 80-foot rolled girder bridge. The project will also include furnish and install of a temporary bridge located downstream from existing to allow for temporary road access during construction activities. Project must start and be complete between July 1st and October 14th as it is part of a wildlife migration corridor.