Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT24R0028
South Park Eleven Mile Canyon RD96 Bridges Guardrail Rehabilitation Revision 002 4/26: Change to Solicitation with New Due Date and Minor Changes as; This addendum to the engineering drawing set updat...
South Park Eleven Mile Canyon RD96 Bridges Guardrail Rehabilitation Revision 002 4/26: Change to Solicitation with New Due Date and Minor Changes as; This addendum to the engineering drawing set updates the following: Replace guardrail standard details with latest CDOT standard M-606-1 dated 03/05/20, as attached. Adjust guardrail height to 31” to meet new CDOT and FHWA standards for Midwest Guardrail Systems. Adjust wooden block from 8” to 12” thickness to meet new CDOT and FHWA standards for Midwest Guardrail Systems. Include transition from new guardrail installation height to marry up with existing bridge rail elevation. Revision 001 - 3/28: 1. Changes Competitive Range to include the possiblities of Options; New Range $700,000 - $1,500,000 2. Sets Pre-Bid Meeting; Date: Tuesday April 16th Time: 1000 MST Location: Entrance to Elevenmile Canyon on County Road 96 in Lake George, CO (38°58'6.65"N, 105°21'46.33"W) 3. Corrects Wage Determination/Place of Performance; Lake George, Colorado with in Park County --- END OF REVISION ALL DOCUMENTS UPDATED --- Scope of Work: This project consists of five road bridges that are to be rehabilitated and have approach guardrails installed. The table below lists bridge mile posts and descriptions as well as roadway features that may affect project access and an excavation disposal area location. Refer to Solicitation Package. REV1: Competitive Range: $700,000 - 1,500,000 Period of Performance is under a strict timeframe: September - October 2024 Pre-Solicitation: 03/20/24 - 04/04/24 Solicitation Begins: 04/05/24 Bids Due: May 3rd, 2024 - 1700 MST Quotes/Proposals accepted through Email Only to lonnie.root@usda.gov once Solicitation is in effect. NOTE: The full package is provided under this Pre-Solicitation for review purposes only, changes may happen when posted as a Soliciation which superceeds all previous documents. Contracting Officer Representative: Caitlin Woods Civil Engineer • FS-R2-Pike & San Isabel NF-SO Email: caitlin.woods@usda.gov