Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT23Q0122
Buzzard Creek Fence Realignment Grand Valley Ranger District - GMUG National Forest PoP: 10 days after Notice to Proceed with project extending into the 2024 Season if needed Fence Removal Furnish all...
Buzzard Creek Fence Realignment Grand Valley Ranger District - GMUG National Forest PoP: 10 days after Notice to Proceed with project extending into the 2024 Season if needed Fence Removal Furnish all supervision, equipment, tools, parts, labor, transportation, lodging, and miscellaneous items for rangeland fence removal. 2.3 miles of existing laydown fence material will be removed; including all posts, wire, braces and stays. All post holes will be filled with existing overburdened soil material. The removed material will be evaluated for condition. Any reusable material will be transported, by the contractor, to the Hightower Guard Station specified in the Buzzard Creek Fence Realignment Planning Map. Any un-useable material will be transported, by the contractor, to be disposed or recycled. Fence Construction Furnish all supervision, materials, equipment, tools, parts, labor, transportation, lodging, and miscellaneous items for rangeland fence construction. The bulk of the work will include the construction of 1.3 miles of wood post and wire laydown fence. The fence construction will require the placement of 8 ft wire gates every 1/4 mile of straight fence line as well as every corner section fence as identified in the Buzzard Creek Fence Realignment Planning Map. This map also indicates the location of the fence being required Fence construction and gate specifications are attached Constructing a laydown fence. Clearing and pruning of vegetation along fence construction lines will be required within 5 ft of both sides.