Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT23Q0107
The Forest Service requires a poswer upgrade for a D2 Tree Cooler. The contractor will need to install a 3 Phase Power for the Tree Cooler to work properly. The Tree Cooler is approximately 16 Feet wi...
The Forest Service requires a poswer upgrade for a D2 Tree Cooler. The contractor will need to install a 3 Phase Power for the Tree Cooler to work properly. The Tree Cooler is approximately 16 Feet wide by 40 feet long and requires extra power. The Tree Cooler requires 240 Volts supplied as well as 400 Amps.