Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT22Q0116
-Restore sewer service to the C-wing restrooms -Perform potholing and camera the lines to determine locations and conditions of existing sewer lines -Remove lengths of existing lines as required for n...
-Restore sewer service to the C-wing restrooms -Perform potholing and camera the lines to determine locations and conditions of existing sewer lines -Remove lengths of existing lines as required for new line installation -Install 4¿ service line from where the existing line servicing the C-wing restrooms exits the building footprint to the parallel service line as shown in the Plans, approximately 32 LF -Upsize the functioning service line to 6¿ diameter from the point of tie-in to the existing 6¿ sewer main, approximately 58 LF -Use at least Schedule 40 PVC for all pipe replacement. Ensure all fittings are compatible with existing materials -Line the existing 6¿ sewer main with CIPP from its point of intersection with the failed service line to the sanitary sewer manhole in the parking lot to the south, approximately 100 LF. -Cut and plug failed 4¿ service line near its junction with the 6¿ main to prevent future backflow from reaching the failed section -Comply with all excavation safety regulations as outlined in 29 CFR 1926 Subpart P -Restore all excavated areas to their original condition -Properly dispose of all waste material resulting from the execution of work under this SOW -Provide as-built drawings