This request is for the fabricating and installation of gates on the Payette NF in 2022. These gates will be fabricated as shown on the plans and installed at the locations shown on the map and as sta...
This request is for the fabricating and installation of gates on the Payette NF in 2022. These gates will be fabricated as shown on the plans and installed at the locations shown on the map and as staked by the COR. Upon gates will be fabricated and painted as shown on the plans. The COR will approve the gate fabrication before gates are installed. The COR will stake the rough gate locations prior to installation. Upon completion of the installation all gates will swing smoothly and be easily locked in both the closed and open positions.