Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LT22Q0088
Amendment 0001 : The purpose of Amendment 0001 is to provide prospective offerors the pre-bid meeting minutes held on August 30, 2022, and to remove references to a Bid Guarantee in the solicitation. ...
Amendment 0001 : The purpose of Amendment 0001 is to provide prospective offerors the pre-bid meeting minutes held on August 30, 2022, and to remove references to a Bid Guarantee in the solicitation. See Amendment 0001, attached for important details. The due date for quotes remains the same September 6, 2022 at 5:00 P.M. local time. Period of Performance: 09/20/2022 to 09/19/2023 Contractor will supply all materials, personnel, equipment and supervision to complete all work as described within the attached Specifications and drawings to include and all necessary valid licenses and permits as required within the Specifications. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery to install water treatment facilities at White Star Campground, including new treatment process, connection to existing utilities, and removal of existing treatment process. All work performed shall be by state licensed contractors. All work performed shall be per the latest edition of the international building codes. B. The contractor shall be responsible for supplying all labor, materials, equipment, utilities, disposal to abandon hand pump water wells per 2 CCR 402-2, Rule 16. Proposals are due 06 SEP 2022. Period of Performance is 365 calendar days after Notice to Proceed (NTP)