Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240LN21Q0044
This project includes all materials, labor and equipment necessary to convert the following composting toilets to vaults toilets. Conversion details of each individual toilet may differ with the overa...
This project includes all materials, labor and equipment necessary to convert the following composting toilets to vaults toilets. Conversion details of each individual toilet may differ with the overall goal of: removing the existing composting units from the toilet basement, sealing the basement area for use as a vault, and providing a means of access for vault pumping. There are total of thirteen (13) toilet conversions at 5 different sites throughout the San Juan National Forest. There is no formal site visit, interested vendors are highly encouraged to visit the site prior to submitting a quotation. Magnitude of Construction Project (per FAR 36.204(c)) - Between $100,000 and $250,000.