Gillete Boat Launch Replacement
1240BJ25R0002
This project involves replacing a failing concrete plank boat ramp with a new concrete panel system, including associated site work, dock resetting, erosion control, and paving. The work must be performed at the specified location where the existing ramp is situated. The government will provide 15 cubic yards of aggregate material for the project.