GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
The government seeks a qualified, licensed contractor to perform the GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest, including all labor, equipment, supplies, testing, inspections, and incidentals for Dripstone and Discovery Trail infrastructure repairs and safety upgrades. Work includes structural stabilization of tunnel entrances/exits, removal of existing supports, masonry repairs, instrumentation and monitoring installation, replacement of air lock/security/bypass tunnel doors, suspended ceiling and ductwork, lighting/distribution components, safety handrails, and the mine phone system, all per drawings and specifications. Amendment 0002 was posted on September 17, 2026, providing RFI questions and answers and a pre-bid sign-in sheet. Amendment 0001 was posted on August 12, 2026, providing Golder specifications. Both amendments must be acknowledged and submitted with the proposal.