GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240BH26R0013

The project covers rehabilitation and safety upgrades to Blanchard Springs Caverns Dripstone and Discovery Trail infrastructure in the Ozark-St. Francis National Forest, including structural stabilization at tunnel entrances and exits, masonry repairs, instrumentation and monitoring, and replacement of air lock, security, and bypass tunnel doors, suspended ceiling and ductwork, lighting and distribution systems, handrails, and mine phone systems. All labor, equipment, supplies, testing, inspections, and incidentals are required, with work by qualified licensed contractors for applicable trades and conformance to attached drawings and specifications. Amendments were posted between August 12 and October 26, 2026, including final RFI Q&A, RFI responses and site-visit sign-in, Golder specifications, and proposal due-date extensions. Each amendment must be acknowledged and submitted with the proposal.

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF FOREST SERVICE USDA FOREST SERVICE
  PSC   Z2PZ REPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES
LOCATION: Not Given
Primary Contact
James Edington
Not Given

Links (0)

Attachments (21)

Document
Size
Access
Updated
C05 SF30 1240BH26R0013-0005.pdf
85.59 KB
Public
Oct 26, 2026
C05a RFI Final QA 1240BH26R0013.docx
32.66 KB
Public
Oct 26, 2026
C05 SF30 1240BH26R0013-0004.pdf
85.05 KB
Public
Oct 13, 2026
C05 SF30 1240BH26R0013-0003.pdf
84.74 KB
Public
Sep 30, 2026
C05b Site Visit 1240BH26R0013.pdf
1.46 MB
Public
Sep 17, 2026
C05 F30 1240BH26R0013-0002.pdf
104.25 KB
Public
Sep 17, 2026
C05a RFI QA 1240BH26R0013.docx
28.75 KB
Public
Sep 17, 2026
C05m Attachment 11 Golder 1240BH26R0013.pdf
980.12 KB
Public
Aug 12, 2026
C05 SF30 1240BH26R0013-0001.pdf
84.38 KB
Public
Aug 12, 2026
C04 SF1442 1240BH26R0013.pdf
321.08 KB
Public
Aug 4, 2026
C04b Attachment 2 Specs BSC LH 1240BH26R0013.pdf
1.19 MB
Public
Aug 4, 2026
C04d Attachment 4 Dwgs BSC Handrails 1240BH26R0013.pdf
85.88 MB
Public
Aug 4, 2026
C04e Attachment 5 Env Assessment 1240BH26R0013.pdf
7.85 MB
Public
Aug 4, 2026
C04g Attachment 7 Recommendations1240BH26R0013.pdf
3.93 MB
Public
Aug 4, 2026
C04c Attachment 3 Drawings BSC 1240BH26R0013.pdf
3.89 MB
Public
Aug 4, 2026
C04k Attachment 11 General Decisio AR20260022 05182026.pdf
1.48 MB
Public
Aug 4, 2026
C04i Attachment 9 Site Visit 1240BH26R0013.docx
124.98 KB
Public
Aug 4, 2026
C04a Attachment 1 SOW BSC 1240BH26R0013.docx
72.71 KB
Public
Aug 4, 2026
C04h Attachment 8 Estim Quant 1240BH26R0013.xlsx
33.39 KB
Public
Aug 4, 2026
C04j Attachment 10 RFI Form 1240BH26R0013.docx
29.46 KB
Public
Aug 4, 2026
C04f Attachment 6 SOI 1240BH26R0013.xlsx
13.29 KB
Public
Aug 4, 2026


Data sourced from SAM.gov. View Official Posting »

GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240BH26R0013

The Blanchard Springs Caverns Dripstone and Discovery Trail Infrastructure project in the Ozark-St. Francis National Forest involves repairs and safety upgrades to cavern trail infrastructure. The scope includes all labor, equipment, supplies, testing, inspections, and incidentals, with work conforming to attached drawings and specifications and performed by qualified, licensed contractors for all applicable trades. Specific tasks include structural stabilization of tunnel entrances and exits, removal of existing supports, masonry repairs, installation of instrumentation and monitoring equipment, and replacement of air lock and security doors. It also includes replacement of suspended ceiling systems, associated ductwork, the bypass tunnel door, lighting and distribution components, safety handrails, and the mine phone system. Multiple amendments have been posted to SAM.gov and must be acknowledged and submitted with the proposal.

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF FOREST SERVICE USDA FOREST SERVICE
  PSC   Z2PZ REPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES
LOCATION: Not Given
Primary Contact
James Edington
Not Given


Data sourced from SAM.gov. View Official Posting »

GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240BH26R0013

The project covers rehabilitation and safety upgrades to the Blanchard Springs Caverns Dripstone and Discovery Trail infrastructure in Ozark-St. Francis National Forest. Scope includes structural stabilization of tunnel entrances and exits, removal of existing supports, masonry repairs, instrumentation and monitoring, replacement of air lock/security/bypass doors, suspended ceiling and ductwork, lighting and distribution components, safety handrails, and the mine phone system. All labor, equipment, supplies, testing and inspections, and incidentals are required, with work by qualified licensed contractors in accordance with attached drawings and specifications. Recent amendments provide RFI questions and answers, a site visit sign-in sheet, and Golder specifications, and must be acknowledged and submitted with the proposal or quote.

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF FOREST SERVICE USDA FOREST SERVICE
  PSC   Z2PZ REPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES


Data sourced from SAM.gov. View Official Posting »

GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240BH26R0013

The government seeks a qualified, licensed contractor to perform the GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest, including all labor, equipment, supplies, testing, inspections, and incidentals for Dripstone and Discovery Trail infrastructure repairs and safety upgrades. Work includes structural stabilization of tunnel entrances/exits, removal of existing supports, masonry repairs, instrumentation and monitoring installation, replacement of air lock/security/bypass tunnel doors, suspended ceiling and ductwork, lighting/distribution components, safety handrails, and the mine phone system, all per drawings and specifications. Amendment 0002 was posted on September 17, 2026, providing RFI questions and answers and a pre-bid sign-in sheet. Amendment 0001 was posted on August 12, 2026, providing Golder specifications. Both amendments must be acknowledged and submitted with the proposal.

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF FOREST SERVICE USDA FOREST SERVICE
  PSC   Z2PZ REPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES


Data sourced from SAM.gov. View Official Posting »

GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240BH26R0013

This project covers all labor, equipment, supplies, testing, and incidentals for infrastructure repairs and safety upgrades at Blanchard Springs Caverns, located in the Ozark-St. Francis National Forest. The scope includes structural stabilization of tunnel entrances and exits, masonry repairs, removal of existing supports, installation of monitoring equipment, and replacement of doors, ceiling systems, lighting, handrails, and the mine phone system. All work must be performed by qualified and licensed contractors in accordance with the attached drawings and specifications. A contract amendment has been issued that requires contractors to acknowledge a specified document with their proposal.

GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240BH26R0013

This contract covers all labor, equipment, supplies, testing, inspections, and incidentals for infrastructure repairs and safety upgrades at Blanchard Springs Caverns. The work includes structural stabilization of tunnel entrances and exits, masonry repairs, and removal of existing supports. It also involves replacing air lock doors, security doors, bypass tunnel doors, suspended ceiling systems, ductwork, lighting and distribution components, safety handrails, and the mine phone system. Instrumentation and monitoring equipment will be installed, and all work must conform to the provided drawings and specifications. All work must be performed by qualified and licensed contractors for all applicable trades.