GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
The project covers rehabilitation and safety upgrades to Blanchard Springs Caverns Dripstone and Discovery Trail infrastructure in the Ozark-St. Francis National Forest, including structural stabilization at tunnel entrances and exits, masonry repairs, instrumentation and monitoring, and replacement of air lock, security, and bypass tunnel doors, suspended ceiling and ductwork, lighting and distribution systems, handrails, and mine phone systems. All labor, equipment, supplies, testing, inspections, and incidentals are required, with work by qualified licensed contractors for applicable trades and conformance to attached drawings and specifications. Amendments were posted between August 12 and October 26, 2026, including final RFI Q&A, RFI responses and site-visit sign-in, Golder specifications, and proposal due-date extensions. Each amendment must be acknowledged and submitted with the proposal.
Links (0)
Attachments (21)
Data sourced from SAM.gov.
View Official Posting »