GAOA South Park Office Rehab Pike National Forest

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240BH26Q0028

This project involves rehabilitating the South Park Office in Pike National Forest, Colorado. The contractor must supply all labor, materials, and equipment for tasks including installing a standing seam metal roof with ice/snow melt system, replacing carpet and ceiling tiles, sealing windows, adding insulation and communication outlets, and installing a chain link fence with a motorized gate. No specific budget amount or performance timeline is provided. Amendments were posted on July 27 and July 28, 2026; each must be acknowledged and submitted with quotes. The location for performance is Pike National Forest.

GAOA South Park Office Rehab Pike National Forest

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240BH26Q0028

The project involves the rehabilitation of the South Park Office in Pike National Forest, requiring the contractor to supply all labor and materials for a standing seam metal roof replacement with ice/snow melt system, interior and exterior modifications including carpet and ceiling tile replacement, electrical and communication upgrades, and installation of a chain link fence with motorized gate. An amendment posted on July 27, 2026, includes responses to questions and the site visit sign-in sheet, which must be acknowledged with quotes. No budget amount or submission timeline is specified.

GAOA South Park Office Rehab Pike National Forest

Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240BH26Q0028

This project requires a contractor to supply all labor, materials, and equipment for a comprehensive renovation, including a new standing seam metal roof with ice/snow melt systems, interior and exterior modifications, and new fencing. The scope of work also covers installing new carpet tiles, replacing damaged ceiling tiles, sealing windows, adding insulation, and installing additional communication and electrical outlets. A chain link fence with a motorized gate and associated electrical and safety features must be installed. No specific budget amount or performance location is mentioned in the description. No non-bid or submission timelines are provided.