Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240BH23Q0036
A. The work of this Contract includes all labor and materials required to install all new wiring, conduit, outlets, electric panel and breakers, electric meter socket, and electric meter box with bypa...
A. The work of this Contract includes all labor and materials required to install all new wiring, conduit, outlets, electric panel and breakers, electric meter socket, and electric meter box with bypass switch and other related appurtenances needed to provide electric service to a recently built, already existing metal storage building. B. All work shall be performed by a licensed and bonded electrician, licensed in the State of Oregon. C. Installation will all be surface mounted on exposed metal studs, on plywood sheathing, or on the exterior metal siding. D. Connection of Consumers Power Inc. (CPI) main feeder into the electric meter will be a separate contract, therefore main feeder connection work is not incorporated into the Statement of Work (SOW). E. All materials and construction shall be in accordance with the SOW, Project Specifications and/or the manufacturer’s recommendations; Federal, State, and local building codes; CPI’s Single Phase Service Requirements; and industry standards. In the event of discrepancies between these requirements, the most stringent requirements shall apply, unless otherwise approved in writing by the Contracting Officer (CO).