Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1240BG24Q0059
Annual Inspection of the fire alarm systems originally installed in 2023 in both the Moscow main building and in the rain lab. Inspect and test all components of fire alarm system to ensure all existi...
Annual Inspection of the fire alarm systems originally installed in 2023 in both the Moscow main building and in the rain lab. Inspect and test all components of fire alarm system to ensure all existing alarms are compliant with NFPA 72, the National Fire Alarm and Signaling Code. Identify any areas of the system that are in need of repairs or replacement. Rocky Mountain Research Station Moscow Forestry Sciences Lab 1221 S. Main Street Moscow, ID 83843 *updated attachment posted 7.22.24* to add previous more Q&A's