KLAHANIE VAULT TOILET AND WELL REMOVAL. OLYMPIC NATIONAL FOREST
This opportunity involves demolishing and disposing of an existing vault toilet building, handpump well, and associated campground items, including concrete foundations and in-ground vaults, with optional removal of fire rings, picnic tables, and signs. The work must be performed in accordance with Washington state well decommissioning standards (WAC 173-160-381) and requires a licensed well driller in that state. The period of performance is from July 15 to December 31, 2026. The location for performance is specified as the Klahanie site, with related plans and reports included. No budget amount is specified.