Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:123A9425Q0038
The objective of this procurement action is to obtain a refrigerated air dryer package, replace existing interconnecting aluminum piping between air compressors with copper piping, and install new cop...
The objective of this procurement action is to obtain a refrigerated air dryer package, replace existing interconnecting aluminum piping between air compressors with copper piping, and install new copper piping lines to supply the lab gas needed to operate liquid chromatography tandem mass spectrometry (LC-MS/MS) instrumentation. Ammendment 1: Updated SOW in Section C and Section M