Prescott National Forest Fire Center Ramp Reseal and Crack Repair
This project involves crack sealing and applying a Fog Seal to the asphalt at the Prescott Fire Center airtanker base, light fixed wing ramp, and helibase. Before the seal is applied, all existing markings and striping must be removed via Hydro Blasting. The contractor is responsible for taking photos and dimensions of existing markings and for accurate field measurements before replacing them. The contractor must provide all materials, equipment, labor, transportation, and mobilization. No specific budget, submission timelines, or performance location beyond Prescott Fire Center are mentioned.