Prescott National Forest Fire Center Ramp Reseal and Crack Repair

Total Small Business Set-Aside (FAR 19.5)
Notice ID:12363N26Q4207

This project involves crack sealing and applying a Fog Seal to the asphalt at the Prescott Fire Center airtanker base, light fixed wing ramp, and helibase. Before the seal is applied, all existing markings and striping must be removed via Hydro Blasting. The contractor is responsible for taking photos and dimensions of existing markings and for accurate field measurements before replacing them. The contractor must provide all materials, equipment, labor, transportation, and mobilization. No specific budget, submission timelines, or performance location beyond Prescott Fire Center are mentioned.

Department/Ind.Agency Subtier Office
AGRICULTURE, DEPARTMENT OF FOREST SERVICE USDA-FS, STEWARDSHIP CONTRACTING BRANCH
  PSC   Z1LB MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
LOCATION: Not Given
Primary Contact
Thomas Tran
Not Given

Links (0)

Attachments (1)


Data sourced from SAM.gov. View Official Posting »